Includes two (2) AG515B Clustered Gateway nodes and Installation and Startup service at the customer site. The startup service includes basic configuration and customer training on basic operations. Initial cluster configuration can have additional configuration at the factory. A rack, SAN switch, Ethernet switch and HP Storage can be ordered as well as additional nodes (up to 16). If a rack is ordered, this configuration can be shipped from the factory racked and cabled.
Het beleid van HP is erop gericht om klanten informatie te verstrekken over de chemische stoffen die zich in de producten bevinden, in overeenstemming met wettelijke verplichtingen zoals REACH (Verordening (EG) nr. 1907/2006 van het Europees Parlement en de Raad). Een rapport met chemische informatie voor dit apparaat vindt u op: www.hp.com/go/reach.